Combine PERT 3-point estimates with CPM scheduling. Get expected time, variance, critical path, and slack in one view.

Use calculatorSee features
PERT CPM Calculator

Enter tasks with optimistic/most likely/pessimistic estimates and dependencies to compute expected time and CPM schedule fields.

100% FreePERT + CPM
Task IDTask nameOptimistic (O)Most likely (M)Pessimistic (P)Dependencies

Separate dependencies with commas or spaces (e.g., "B,C" or "B C").

Formulas & definitions

Expected time: TE = (O + 4M + P) / 6.

Variance: ((P - O) / 6)^2.

Slack (float): LS - ES.

Critical path = tasks with Slack = 0 that define total duration.

Results

Expected time, variance, schedule fields, and critical path.

Total duration

17,83

Project variance

2,69

Project std dev

1,64

Critical tasks

4

Critical path

A -> B -> C -> D

Critical tasks (Slack = 0)

ABCD
IDNameOMPTEVariancePredecessorsESEFLSLFSlack
ACriticalPlanning24640,44N/A04-04-0
BCriticalDesign3595,331A49,3349,33-0
CCriticalBuild46106,331B9,3315,679,3315,670
DCriticalReview1242,170,25C15,6717,8315,6717,830

Slack = LS - ES. Critical tasks have Slack = 0.

AI Insights (Optional)

Get concise, risk-aware insights based on your PERT + CPM results.

Avoid sharing personal or sensitive data. AI output is advisory.

References

Definitions and background for PERT and CPM.

  • PERT (Program Evaluation and Review Technique) — overview
  • Critical Path Method (CPM) — overview
Explore more tools

Browse all calculators and find adjacent planning tools.

All calculators

Why this tool is different

PERT + CPM in one flow

Estimate uncertainty and compute the schedule in one pass.

Validation first

Detect missing IDs, bad estimates, and dependency cycles before calculating.

Exportable results

Copy a clean summary or export CSV/JSON for reports.

AI insights (optional)

Get concise risk-aware insights based on your schedule.

How it works

1

Add tasks

Enter task IDs, 3-point estimates, and dependencies.

2

Review results

We compute expected time, variance, ES/EF/LS/LF, and critical path.

3

Export and share

Copy a summary or export CSV/JSON for reuse.

FAQ

Plan with clearer timelines

Calculate expected time and critical path in seconds.

Start now

CPM here means Critical Path Method (project scheduling), not advertising CPM. Results depend entirely on your inputs.

LogoMDZ.AI

Ganhe Dinheiro com IA

hello@mdz.aiX (Twitter)
AI Chat
  • All-in-One AI Chat
Tools
  • ROAS Calculator
  • CPC Calculator
  • CPC to CPM Calculator
  • CRM ROI Calculator
  • MBA ROI Calculator
  • SaaS ROI Calculator
  • ROI Calculator XLSX
AI Text
  • Amazon Listing Analyzer
  • Competitor Analysis
  • Product Description Generator
  • AI Ad Copy Generator
  • Product Title Generator
  • Product Title Optimizer
  • Review Response Generator
  • AI Hashtag Generator
  • Email Subject Line Generator
  • Instagram Caption Generator
AI Image
  • GPT-5 Image Generator
  • Nano Banana Image Editor
  • Nano Banana Pro 4K Generator
  • AI Logo Generator
  • Product Photography
  • Background Remover
  • DeepSeek OCR
  • AI Mockup Generator
  • AI Image Upscaler
AI Video
  • Sora 2 Video Generator
  • Sora Watermark Remover
  • TikTok Video Downloader
  • Instagram Reels Downloader
  • X Video Downloader
  • Facebook Video Downloader
  • RedNote Video Downloader
AI Music
  • Google Lyria 2 Music Generator
  • TikTok Audio Downloader
AI Prompts
  • ChatGPT Marketing Prompts
  • Nano Banana Prompt Examples
Produto
  • Recursos
  • Preços
  • FAQ
Recursos
  • Blog
Empresa
  • Sobre
  • Contato
Featured on
  • Toolpilot.ai
  • Dang.ai
  • What Is Ai Tools
  • ToolsFine
  • AI Directories
Legal
  • Política de Privacidade
  • Termos de Serviço
© 2026 MDZ.AI All Rights Reserved.
Featured on findly.tools|Turbo0Twelve.toolsAIDirsGenifyWhatIsAIAgentHunterNavFoldersAI工具网AllInAIMergeekAIDirsToolFameSubmitoS2SOneStartupGEOlyDaysLaunchStarterBestTurbo0LaunchIgniterAIFinderOpenLaunchBestskyToolsSubmitAITools|