Logo
HOT
NEW
NEW
NEW
Project Scheduling Tool

CPM Graphing Calculator

Create a Critical Path Method (CPM) network diagram from tasks and dependencies. Instantly calculate ES/EF/LS/LF/Slack, highlight critical tasks, and export a shareable summary.

Use calculatorSee features
CPM Graphing Calculator

Enter tasks, durations, and dependencies to calculate CPM schedule fields and render an AON network graph.

100% FreeDeterministic
Task IDTask nameDurationDependencies

Separate dependencies with commas or spaces (e.g., "B,C" or "B C").

Results

Schedule fields (ES/EF/LS/LF/Slack), total duration, and critical tasks.

Total duration

9

Critical path

A → B → D

Critical tasks (Slack = 0)

ABD
IDNameDurationPredecessorsESEFLSLFSlack
ACriticalTask A2N/A02020
BCriticalTask B3A25250
CTask C1A23452
DCriticalTask D4B, C59590

Slack = LS - ES. Critical tasks have Slack = 0.

Network Graph (AON)

A simple activity-on-node graph with critical tasks highlighted.

Tip: hover a node to highlight its predecessors and successors.
ATask AES 0 · EF 2 · Slack 0BTask BES 2 · EF 5 · Slack 0CTask CES 2 · EF 3 · Slack 2DTask DES 5 · EF 9 · Slack 0
Critical task / edgeDependency edge
AI Insights (Optional)

Get a practical explanation, risks, and next-step recommendations based on your CPM result.

Avoid sharing personal or sensitive company data. AI output is advisory.

Why this tool is different

Graph + schedule table

AON network diagram plus ES/EF/LS/LF/Slack in one place.

Strong validation

Detect unknown dependencies and cycles before calculating.

Copyable output

Copy a clean summary for homework, reports, or stakeholder updates.

AI insights (optional)

Get practical explanations, risks, and next-step recommendations.

How it works

1

Add tasks

Enter task IDs, durations, and predecessor IDs.

2

Get CPM results

We compute ES/EF/LS/LF/Slack and identify critical tasks.

3

Export and share

Download the graph or copy a summary for reuse.

FAQ

Turn schedules into clarity

Generate a CPM network diagram and share results in seconds.

Start now

CPM here means Critical Path Method (project management), not advertising CPM. Results depend entirely on the task durations and dependencies you provide.

LogoMDZ.AI

AIで収益を上げる

hello@mdz.aiX (Twitter)
AI Chat
  • All-in-One AI Chat
Tools
  • ROAS Calculator
  • CPC Calculator
  • CPC to CPM Calculator
  • CRM ROI Calculator
  • MBA ROI Calculator
  • SaaS ROI Calculator
  • ROI Calculator XLSX
AI Text
  • Amazon Listing Analyzer
  • Competitor Analysis
  • Product Description Generator
  • AI Ad Copy Generator
  • Product Title Generator
  • Product Title Optimizer
  • Review Response Generator
  • AI Hashtag Generator
  • Email Subject Line Generator
  • Instagram Caption Generator
AI Image
  • GPT-5 Image Generator
  • Nano Banana Image Editor
  • Nano Banana Pro 4K Generator
  • AI Logo Generator
  • Product Photography
  • Background Remover
  • DeepSeek OCR
  • AI Mockup Generator
  • AI Image Upscaler
AI Video
  • Sora 2 Video Generator
  • Sora Watermark Remover
  • TikTok Video Downloader
  • Instagram Reels Downloader
  • X Video Downloader
  • Facebook Video Downloader
  • RedNote Video Downloader
AI Music
  • Google Lyria 2 Music Generator
  • TikTok Audio Downloader
AI Prompts
  • ChatGPT Marketing Prompts
  • Nano Banana Prompt Examples
製品
  • 機能
  • 料金
  • よくある質問
リソース
  • ブログ
会社
  • 会社概要
  • お問い合わせ
Featured on
  • Toolpilot.ai
  • Dang.ai
  • What Is Ai Tools
  • ToolsFine
  • AI Directories
法的情報
  • プライバシーポリシー
  • 利用規約
© 2025 MDZ.AI All Rights Reserved.
Featured on findly.tools|TopHubTurbo0NAVG8ToolgameSuboAIDirsAMZdirNuxtDirGenifyWhatIsAIAgentHunter干饭猫NavFoldersAgentWiseAI工具网AllInAIMergeekAIDirsBestToolsToolFameSubmitoS2SOneStartupGEOlyDaysLaunchStarterBestTurbo0LaunchIgniterAIFinderOpenLaunchBestskyToolsSubmitAITools|